anne
Well-known member
- Joined
- Jan 28, 2006
- Messages
- 1,752
- Reaction score
- 0
I know that different companies may do this differently, but I'm trying to anticipate a problem with getting my spa set up.
I have built a "sandbox" style gravel bed. It is filled with 3/8" crushed rock. I think that the tub will be "rolled" in on its side, but then how are they generally lowered to horizontal? I'm imagining that if the tub is brought in on its side next to the edge of the gravel filled box, then lowered down, that the leading edge in the gravel will dig in as it lowers, and ruin any levelness I achieved with the gravel. (Does that make sense?)
I was thinking of coming up with a big flat piece of plywood to have under that edge, supported somewhat by the 2x6s that make up the box. Then once the tub is horizontal, we'd lift it a bit to pull the wood out......
or am I anticipating problems that the delivery crew will know how to handle? :
I have built a "sandbox" style gravel bed. It is filled with 3/8" crushed rock. I think that the tub will be "rolled" in on its side, but then how are they generally lowered to horizontal? I'm imagining that if the tub is brought in on its side next to the edge of the gravel filled box, then lowered down, that the leading edge in the gravel will dig in as it lowers, and ruin any levelness I achieved with the gravel. (Does that make sense?)
I was thinking of coming up with a big flat piece of plywood to have under that edge, supported somewhat by the 2x6s that make up the box. Then once the tub is horizontal, we'd lift it a bit to pull the wood out......
or am I anticipating problems that the delivery crew will know how to handle? :