Leveled cement (Pictures added).

cooltoy2000

Well-known member
Joined
Jun 29, 2006
Messages
1,025
Reaction score
0
Hello.

This would be my first post, but I have been reading this forum for about a month. The reading was very helpful in choosing my first tub. I chose the Hot Spring Vanguard, which should be delivered in a week or so.

I planned for this day eight years ago, when I first poured the cement pad for the tub. I was doing some measurements on the pad a couple of days ago and realised that the pad was slightly off level. It is tilted forward a couple of degrees.

Is that an issue? Do I need to level it before the tub goes in? If so what is the best way to do that - leveling cement?

Thanks for your help.
 
I had a cement pad put down last fall. It has a slight tilt for water runoff. I can't remember exactly the amount of tilt-maybe an inch or inch and a half from side to side. My new tub was installed last friday with no shims and no problems. Any lack of levelness in the water line is unnoticable. I didn't like the idea of shims and decided in advance I would live with an unlevel water line, but if it is not level, it is not noticable.   Also, I think you want some tilt with your cement pad so water will run off and not pool. Hope this helps.
 
What is the drop, over how long?

(ie: it drops .25" over 8 feet).  

you poured the pad 8 years ago?

Should be just about cured.  ;)
 
I do not like the idea of shims either.

I will check on the amount of drop when I get home tonight.
 
I would not be concerned with an inch or so. If it was more then you may notice it. Mine has an 1 1/2 slope with no effect to the tub.
 
The idea of shims also doesn't appeal to me.  

Persoanlly for me, I wouldn't want more than a .25" drop across the tub This can effect the jets not being submereged and looks funky as well.

I don't know what the tolereances that manufactuer's state. But if you do have a significant slope (they say some slope is good for water run off)  folks in this forum have talked about "mud jacking"; injecting cement under the pad to raise it to the correct slope., or  simply just pouring a new top coat on the pad and correcting the slope.
 
There are leveling products that can be used to level off concrete.  Not exactly cheap, but they work well.
 
The one I used was to level a section of basement concrete for a shower pan, if I recall, it setup and was ready for use in a day or so.  Unless the slab is way off, the coating to level will be pretty thin, and set rather quickly.

 
Thanks.

This is the same stuff I was thinking off. Darker grey in colour, my builder used it to level the flour toward the drain. But will it stand up to outdoors?
 
Don't use the leveling products if you have frost in the winter.
Steve
 
So my new Vanguard was delivered today.

Turns out the pad was not only tilted forward but a bit sideways two (towards one corner).

So they had to shim the tub, good thing I chose Hot Spring and shimming is possible.

Got her filled up and heating. Hoping to use it for the first time tomorrow night.
 
Make sure you post pics!  Have fun in the new Vanguard!   ;D

Marc
 
The location:

CIMG1060.jpg


CIMG1059.jpg


The close up:

CIMG1066.jpg


CIMG1062.jpg


The colours:

CIMG1063.jpg


CIMG1072.jpg


CIMG1075.jpg


CIMG1076.jpg


CIMG1073-1.jpg
 
Looks great. Welcome to spatopia!

May you soak long and prosper.

Oh, and change your water in one month from today.

:)
 
Thanks.

One month from a week ago. :P ;D

Day time pics.

View from the house:

76b615bb.jpg


Views from the park:

8947c572.jpg


1980519b.jpg


071c6dab.jpg


View from Hot Tub:

CIMG1081.jpg
 
How cool! Sure makes a nice setting.

Here's my view from the tub:

potd-20030917.jpg

I use it mostly at night... ;)
 
Back
Top