Hi gang,
Here are some pics of my deck expansion. We finished up today!! Called the dealer to order my Epic. Three weeks (from Tuesday) and counting
We made a frame from the existing deck.
Then used the frame to set our posts in place.
Ran the electrical stuff.
The finished project. This pic is looking at where the front of the tub will be.
This will be looking at the left side of the tub.
This will be the back of the tub.
Thanks to Drewski for the instructions on posting pics!! Another one of the MANY helpful people on this forum. This place is the BEST. The only bad thing is that I am so SORE and tired and I don't have a tub. When I called my dealer to order, we joked about me coming to the store and soaking. If I would have been serious, I sure he would have let me. Anyway, this is going to be the three LONGESTS weeks of my life.
drprwnap