Hi all,
About to pull the trigger on a new J-280 hot tub, and I'm trying to figure out the most cost-effective method for the base.
Unfortunately due to limited space, overhead wires and an existing inground pool, I pretty much have 1 spot I can put it. This spot is partially on an existing concrete slab, and partially on bare ground.
Will I have to break out a section of the slab and pour a new 8x8 area? Or break it and do a gravel base? Can I just do the bare ground in a gravel base as long as it's level with the slab? I'm up in Eastern Canada so very cold winters if that makes a difference.
I'd like something that looks clean and isn't going to break the bank, but I want it to be sturdy and last as long as possible so I will pay the $$ if needed. Open to suggestions!
Thanks,
Dan