We did everything except replastering the pool,and the pavers. I/we did have em redo the coping bricks,as the first crew made 0 miters etc,and it looked like doodoo. I redid the waterline tile,as the same crew that first did the coping bricks,screwed that up too. (I had to physically show em how and where to cut the miters on the inside and outside corners,of the brick coping)
We had lots of trubs with that company,and in the end,I wish I had done everything. The idea behind us hiring a company,was to free up my time.
The pool enclosure is standard screening.