Welcome to our forum.
Good looking concrete work and very nice finale! Congrats!
Hottubdan. I made the steps for less then $100.00 bucks. Very simple, 2 2x8x10 pressure treated lumber and 2 8' veranda(Home Depot)decking, some deck screws, 90 degree brackets and a quart of grey outdoor stain.
Thanks again for all the nice responses. Summerside9000 yes it was 3% air entrained with a min 25 mPa. Reinforced with a grid of 1/2in rebar every 12inches. That concrete slab will still be there long after this hot tub is gone and then will probably be replaced with another hot springs tub. Lol