Started out removing the top soil and compacting the sub soil.........
(http://i49.photobucket.com/albums/f261/spiman01/1141426437.jpg)
(http://i49.photobucket.com/albums/f261/spiman01/1141426203.jpg)
Then about 4.5 ton of 2b stone and 1 ton of pea gravel on top and compacted, all done........
(http://i49.photobucket.com/albums/f261/spiman01/1141426283.jpg)
A little much on the stone, but needed it to get the required height of 18" above the deck...... :-/
-
Spiman. Do you have a delivery date yet?
-
Spiman. Do you have a delivery date yet?
No I don't but I didn't bug the dealer yet either as I fell behind a little bit this weekend due to a sickness bug biting me. Dam bugs.
I have to set the patio block on top of the stone yet and make sure everything is level, then about an hour or so left on the wiring.
I was hoping to have all this and the decking started this weekend but will probably start tomorrow after work.
Started the new job today still wiped out from the weekend on the sofa.........Ugh.......but it went good.