Welcome to our forum.
We made a wooden box form of 2x6 and filled it with 4 inches of gravel and sand. We then used those cheap concrete pavers. Solid as a rock and considerably cheaper than concrete.
Allowing for slab work and concrete cure, I could be in hot water in as little as two weeks.