Had the county electrical inspector out today and passed with no problems. Everything worked pretty well, I walked him through the installation and it only took 15 or 20 minutes. I included a couple of flood lights that I installed on the deck as well. Didn't have to bond the downspouts (I know that been a question on the board as of late..) or anything like that but I did run conduit all the back to the service panel.
So now I'm offically legal and can close the install chapter and just enjoy the tub!!