well, it comes to this, concrete to be poured wed talked to the concrete guy and he said only have to wait a week for drying time on cement. Even if my tub happens to be ready next week I'm still planning on a June 19th or June 26th install anyway, I want to make sure we are totally ready for the hot tub before we install my coleman dealer said he'd rather it be in the shop waiting then us waiting on him. So in case something comes up or we hit a snag, I'm not getting in a hurry for anything (even though my brain is saying "you fool!!! get that hot tub yesterday!" ) We have everything level and ready for framing going to Billings tomorrow to pick up the bricks for the walkway and the wood for the gazebo, both sets of steps, and the electrical. Then it's time to get serious! Hubby has two people helping him so, I just stay out of the way.