Hey everyone,
I know the hottub manufacturer, in this case Sundance, has a pre-installation checklist.... But has anyone put together one of their own?
I'm looking for the "gotchas" people have had. Somewhere I read it's good to put some sort of pipeline in the cement pad to run the electric through.
Any other cool ideas or suggestions people have?
I'll be putting my tub on a pad raised about 18 inches above ground level, and building a deck up to the top of the pad. I'll be putting up some sort of lathe on two sides of the tub, and the electrical subpanel will be about 10 feet away, near the sliding glass door entrance to the house.
I'm just not sure what things I should be considering in the plan... which I am able to make from scratch.
Any help? Anyone? Buehler? hehe.