Hi,
I'm new here and will soon (hopefully) be new to hot tub ownership.
We have an existing concrete pad that is 5.5' x 11'. However, it is not completely level, it slopes up to about a half an inch. And, we want to get a tub that is about 7' x 7', so obviously the pad it not quite bit enough.
My questions are:
1. Is the slight unneveness of the pad a problem?
2. To extend the pad, could we do about two feet of gravel in a frame?
3. Alternately, could we extend the pad by 2 feet with concrete, and on top of the existing pad, put on a top level of about 2-3 inches to make it level?
Thanks. Who knew getting a hot tub would be so complicated!?