Cheers and Happy New Year everyone! Here's hoping world tensions simmer down a bit in 2012.
Cheers and Happy New Years everyone! Here's hoping world tensions will simmer down in 2012.
I have been lurking and learning for 6 months and really appreciate the generous advice on this forum. Here on mild southern Vancouver Island our options locally are Jacuzzi, Sundance, Beachcomber, Maxx, Coast, Bullfrog and H2O. We are liking an H2O Radium spa which measures 80" X 80". We have an excavator working and concrete being poured on our property next week for a renovation so I need to quickly figure out what to tell the contractor about how we want the slab prepared for the future hot tub. I have searched previous posts and still have questions. I'm assuming we need to dig down to hard-packed soil. Some posts suggest rebar or wire mesh - can someone explain exactly what I should tell my contractor? What depth of concrete and what size pad would be reasonable for this spa, bearing in mind that we might change spas in the future? The ground is level near our back door and we have the option to position the spa partially under the eaves if we snug it right up to the house. Would that be a good idea? Or we could have it a bit away from the house and extend the roof. Or have it partially or totally uncovered. We're renovating so all options are possible. Thanks for any advice!