Welcome to our forum.
Make sure that the wiring can handle 60 amps. Size of the wire and distance matters when it comes to current capacity.
I have a 2005 Sundance (Sweetwater) Bahia. We were told by the dealer that we had an option of 50/60 amp service as well and only needed jumper changes along with specific wiring etc. We opted for the 60 amp service, installed the correct breakers, wire etc. To this day we cannot get the jumpers arranged, in any configuration, that allows operation of the heater and pumps full out simultaneously. So...not sure what the deal is on this, but reading your post reminded me. We have long since given up on the option.
Here's the board from my Optima set up for 60 amps. The arrow is pointing to the jumper that needs to, uh, jumped...