I had already put down the deposit, just had to wet test to make sure. Did that yesterday and was great. Cant wait to get it delivered. But that is going to be a while, even thou I took the floor model.
I need to get the electric put in, any idea what the going close of having 220V run from the panel is?
I am planning on putting the spa on Spa Pads, so I need to remove the grass then build a base. I am hearing all kids of things about the base, from crushed granite, to pea gravel, course sand on top or bottom, then all this from 10 inches to 2 inches. I plan on preparing this spot myself, to save a littel bit of cash. Suggestions / experiences
Cant wait to get in it. but lookis like it might be a month of 2